Share this post on:

Ion m3 . In the course of the calculation of the ecological scheduling plan of
Ion m3 . Throughout the calculation from the ecological scheduling plan of the reservoir, the minimum water volume was regarded because the water volume for the sediment transport. In consideration of the flood from July to October and guaranteeing the sediment of 800 million tons inside the future in the downstream of the Yellow River, it requirements to keep the minimum water volume for a JPH203 custom synthesis distinct flow capacity of your key channel, below which the reservoir can regulate the flow and sediment entirely. 4.two.2. Ecological Water Requirement Coupling Result of Every Fracture Surface in the Mainstream of the Yellow River Based on the thought described above on ecological water requirement coupling, we acquire the ecological water requirement coupling outcome of each and every fracture surface from the mainstream of your Yellow River as Table 4. One example is, in the Shizuishan area (fracture surface), the flow demand for fish from November to March is 150 (m3 -1 ), while the demanded value for the maintenance on the eco-hydrological connection among distinctive sections is 325 (m3 -1 ) in the very same duration. In addition, necessary flood values are provided with proper time and duration based on the fracture surfaces.Table four. Ecological water demand coupled final results inside the maintenance of the eco-hydrological connection amongst unique sections (Shizuishan, Toudaoguai, etc.) around the Yellow River.Fracture Surfaces Category Flow Elements Low flow Pulse flow Low flow Flood Acceptable Low flow Pulse flow Low flow Low flow Pulse flow Low flow Flood Low flow Pulse flow Low flow Low flow Low flow Low flow Low flow Low flow Low flow Low flow Low flow Low flow Low flow Pulse flow Low flow Flood Huayuankou Distribution Time November to March April to June April to October July to October November to March April to June April to October November to March April to June April to October July to October November to March April to June April to June July to October November to March April to October November to March April to October November to March April to October November to March April to October November to March April to June April to October July to October Flow (m3 -1 ) 325 400 325 Flood 1000 1500 330 900 330 125 400 125 Flood 1000 1500 250 800 250 300 130 130 240 240 150 150 300 300 200 1400 200 3500 3500 or one particular floods in five years 5150 and 3550 400 1700 800 IL-4 Protein Data Sheet Continuous A single time inside a year at the very least Continuous Continuous A single time in a year a minimum of Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous 1 time within a year at least Continuous Much more than 6 days About 40 days About 9 days About 28 days Far more than six days Continuous 1 time within a year a minimum of Continuous Continuous One time within a year at the very least Continuous Frequency Continuous 1 time within a year at the very least Continuous DurationMinimum ShizuishanMore than 6 days About 20 days Additional than six daysMinimum ToudaoguaiMore than 8 days About 20 days Far more than 8 daysAppropriateMinimum Longmen Appropriate Minimum Tongguan AppropriateMinimumAppropriateLow flow Pulse flow Low flowNovember to March April to June April to OctoberInt. J. Environ. Res. Public Wellness 2021, 18,12 ofTable four. Cont.Fracture Surfaces Category Flow Components Low flow Pulse flow Low flow Distribution Time November to April April June to October Flow (m3 -1 ) 70 80 400 200 300 3500 or a single floods in 5 years 5150 and 3550 120 290 1800 500 700 Continuous Continuous Continuous Frequency Continuous Continuo.

Share this post on:

Author: DNA_ Alkylatingdna